Northern Gateway (SH1)

The Northern Gateway project was one of New Zealand’s largest and most challenging roading projects. It affected 7.5km of road and involved the construction of six major structures including a full diamond interchange at Orewa, eco-viaducts at Nukumea and Otanerua, twin bridges at Waiwera, an overbridge at Hillcrest and twin tunnels through Johnstone’s Hill. The Northern Gateway was the final stage of the realignment and extension of the Northern Motorway between Albany and Puhoi to the north of Auckland. The Northern Gateway allows state highway traffic to bypass Orewa, which eases traffic congestion and reduces delays for the public travelling between Auckland and Northland.


Skill level: Our Management team has over 8 years experience of maintaining and installing street lighting systems in the greater Auckland area.

Competency: In addition to the major projects referenced, we also have term contracts for the streetlight maintenance for Papakura District Council, Rodney District Council, and North Shore City.

Responsiveness: Responsiveness was demonstrated through being able to provide a solution to the tunnel CCTV and VMS requirement, which were additional to the scope of work contracted.

Risk management: At the start of the contract, a detailed site hazard identification chart was drawn up, which was kept onsite with the Traffic Management Plan. A specialist STMS was used for all level 2 and 3 traffic management. All staff attended required training courses on health and safety and traffic management.


Ability to meet programme: Close management of progress against programme ensured no slippage occurred.

Achieving specified standard: Close and open communication with the client ensured specifications were clearly understood.

Defect management system: The use of incident report forms to trigger Non Conformance was utilised on this contract. Once this trigger had been set the company procedures where instigated to ensure the remedial work was tracked through to satisfactory completion.

Project Commencement:             Dec 2007

Completion Date (Original):          Dec 2008

Completion Date (Extended):       Jan 2009

Completion Date (Actual):            Jan 2009

Additional requirements were added to the scope of work, and installation of CCTV and VMS for the tunnel.


Meeting H&S requirements: An excellent safety record was held throughout this contract with both staff and public safeguarded through a comprehensive Health and Safety Plan.

Traffic Management Control: Site specific pedestrian and traffic management solutions were developed to allow for safe and continuous flow of all traffic.


Quality Management: Through the adherence to a contract specific QMS, an exceptional final product was achieved, setting a new standard for future projects.

Financial management: Matrix software, updated daily, provides accurate budget information that is readily available to the client.